Enclosures for golf courses

Cuadro de texto: Trifolds
Golf course trifold (PDF 575 KB)
Golf course enclosures  (PDF 1.6 MB)

Downloads
Photos

           MOYANO has developed and implemented in recent years a new business line for the design, manufacturing, installation and maintenance of golf course enclosures.

 

MOYANO’s activities for golf courses

 

Structural calculation for the set of towers, ironwork and netting in accordance with the surface to cover, the wind speed and the quality of netting used.

Design of towers, ironwork and foundations.

Manufacturing and installation of the whole assembly (towers, ironwork and netting).

Project delivery and Project management

After-sales installation maintenance.

 

MOYANO has developed the following projects in 2006:

 

Practice and pitch and putt course enclosure in the third station of Canal de Isabel II in Madrid (Av. Filipinas). 36 lattice towers of 25 and 30 metres height were installed and 30,000 m2 of high-resistance polyamide netting (nylon) prepared for continual hitting.

 

 Practice and pitch and putt course enclosure in the Las Palmeras Golf Course in Las Palmas de Gran Canaria. 11 towers of 20 metres height were installed and 10,000 m2 of high-resistance polyamide netting (nylon) prepared for continual hitting.